- Canonical Source: https://chinaoriginatlas.com/enterprises/jiangsu-ankoh-smart-electric-gil/
- Publisher: China Origin Atlas

# Jiangsu Ankoh Smart Electric Co., Ltd.

Location: Liyang Economic Development Zone, Changzhou, Jiangsu · Origin Cluster: Changzhou Power Transformers & Grid Equipment Corridor
National manufacturing single-champion in 220kV-1000kV underground Gas-Insulated Transmission Lines (GIL) and prefabricated smart modular substations—cutting substation land footprints by 70% for AI data centers and dense cities.

## Reputation & Role

Local Standing: Founded by Changzhou transformer veterans (with leadership tracing back to Huapeng and Sieyuan Toshiba), bridging power transformers directly into turnkey grid corridors.
Notable Deployments: Pioneered commercial UHV underground GIL installations eliminating overhead transmission corridors in dense industrial zones and delivering fast-track modular substations for hyperscale computing parks.

## Core Manufacturing Scope

- 220kV-1000kV Underground Gas-Insulated Lines (GIL) Aluminum-alloy enclosed high-current underground transmission ducts (up to 4,000A-6,300A) replacing overhead pylons and multi-circuit XLPE trenches IEC 62271-204, IEEE C37, National UHV GIL Specs
- Prefabricated Smart Modular Substations (E-House / Plug-and-Play Skids) 35kV-220kV factory-integrated steel substation modules combining power transformer, GIS/C-GIS, relays, and cooling inside craneable skids IEC 62271-202, IEEE C37, UL/KEMA Component Options
- 500kV-750kV High-Voltage Cable Accessories & Joint Systems Pre-molded silicone rubber GIS terminations, outdoor composite terminations, and cross-bonded joints for EHV underground grids IEC 62067, IEC 60840, KEMA Pre-Qualification

## Scale & Global Reach

Campus Scale: Dedicated EHV GIL precision machining, dust-free silicone molding, and modular substation integration campus in Liyang, Changzhou.
Export Footprint: Deploys underground GIL corridors, modular E-House substations, and EHV cable accessories for hyperscale data centers, urban grid burial projects, and renewable hubs.

## Enterprise FAQ: Ankoh Smart Electric


### Why choose underground GIL instead of standard XLPE high-voltage cables for AI data centers?

A single GIL pipe carries up to 4,000-6,300 amps with far lower dielectric loss, zero fire hazard, and no need for multiple parallel cable trenches—ideal where right-of-way is tight and overhead pylons cannot win permits.

### How much site space and time does an Ankoh modular substation save?

Factory pre-integration cuts substation land area by up to 70% compared with conventional air-insulated yards and reduces on-site erection and commissioning from 12-18 months down to roughly 2 weeks.

### Does Ankoh also supply EHV cable joints independently of GIL projects?

Yes. Ankoh manufactures KEMA-tested 110kV-500kV+ silicone rubber terminations and joints compatible with global XLPE power cables.
